Success Stories

Bank Saves Millions by Optimizing Mainframe Capacity with CPT Global

Written by CPT Global | Nov 4, 2024 12:15:00 PM

Challenge 

A major global bank needed to increase their mainframe system capacity while adhering to a tight IT budget. Another vendor proposed a hardware upgrade of 750 MIPS, far exceeding the bank's actual requirements. 

CPT Global’s Actions 

  • Conducted a thorough analysis of z16 capacity options, leveraging two years of previous mainframe optimization work with the bank. 
  • Identified that prior MIPS reductions and WLM configuration changes negated the need for a larger upgrade. 
  • Recommended reducing the hardware proposal by two CPUs to meet capacity needs cost-effectively. 

Results 

  • $1.5 million saved annually in software costs. 
  • $140,000 saved per mainframe by avoiding unnecessary zIIPs. 
  • Maintained workload stability while preparing for a seamless 2024 workload refresh. 

By working with CPT Global, the bank avoided costly hardware upgrades, saving millions while meeting their capacity requirements.